{"id":4268,"date":"2023-06-30T10:40:17","date_gmt":"2023-06-30T10:40:17","guid":{"rendered":"https:\/\/revconstruction.pt\/outputs\/e4-4-1-report-of-workshops-developed-with-the-industry\/"},"modified":"2023-06-30T10:40:17","modified_gmt":"2023-06-30T10:40:17","slug":"e4-4-1-report-of-workshops-developed-with-the-industry","status":"publish","type":"outputs","link":"https:\/\/revconstruction.pt\/en\/outputs\/e4-4-1-report-of-workshops-developed-with-the-industry\/","title":{"rendered":"E4.4.1 &#8211; Report of workshops developed with the industry"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Report on Task T4.4.1 of Activity 4 &#8211; PLAN4Digital: Framework for technological implementation, regarding the first workshop held with industry to identify concrete and strategic measures to be adopted for the digitalisation of the sector.<\/p>\n","protected":false},"template":"","categoria-output":[29],"class_list":["post-4268","outputs","type-outputs","status-publish","hentry","categoria-output-report"],"_links":{"self":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/outputs\/4268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/outputs"}],"about":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/types\/outputs"}],"wp:attachment":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/media?parent=4268"}],"wp:term":[{"taxonomy":"categoria-output","embeddable":true,"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/categoria-output?post=4268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}