{"id":4266,"date":"2023-06-30T10:38:53","date_gmt":"2023-06-30T10:38:53","guid":{"rendered":"https:\/\/revconstruction.pt\/outputs\/e3-1-interfaces-identification-and-characterisation\/"},"modified":"2023-06-30T10:38:54","modified_gmt":"2023-06-30T10:38:54","slug":"e3-1-interfaces-identification-and-characterisation","status":"publish","type":"outputs","link":"https:\/\/revconstruction.pt\/en\/outputs\/e3-1-interfaces-identification-and-characterisation\/","title":{"rendered":"E3.1 &#8211; Interfaces Identification and characterisation"},"content":{"rendered":"\n<p>Report on Task T3.1 of Activity 3 &#8211; Development of Interoperability mechanisms, including connection to BIM, which aims to identify and characterise the needs for interoperability with different systems throughout the construction process.<\/p>\n","protected":false},"template":"","categoria-output":[29],"class_list":["post-4266","outputs","type-outputs","status-publish","hentry","categoria-output-report"],"_links":{"self":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/outputs\/4266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/outputs"}],"about":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/types\/outputs"}],"wp:attachment":[{"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/media?parent=4266"}],"wp:term":[{"taxonomy":"categoria-output","embeddable":true,"href":"https:\/\/revconstruction.pt\/en\/wp-json\/wp\/v2\/categoria-output?post=4266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}